/></noscript>
  </head>
  <body data-ng-app=
Will Iam
Reputation Silver

Will Iam

Montreal, Quebec

Education

Escuela de Ingenierías Industrial e Informática
Grado en Ingeniería Industrial Mecánica
Universidad Politécnica de Valladolid
Ingeniería Técnica Industrial Mecánica

Reputation Dashboard

  • Google+
  • LinkedIn

Work

Aeronautical Stress Engineer
Altran
2013
Customer:
Airbus, Alestis
Main activities and responsibilities:
Stress activities for concessions produced during manufacturing support of the projects:
- A320 and A330 series S18, S19.1 and Door Pax
- A380 S19 and S19.1
Stress analysis of metallic and composite cross joints at project:
- A350 Belly Fairing
Tools:
Analysis of both metallic and composite structures using finite element analysis (FEM with Nastran/Patran) and analytical "hand" calculations (Excel& visual Basic). Airbus legacy tools (Urco, Ancolab, Cofus, Ares, PPC…), ISAMI, SAP, and certification documents are used.
Aeronautical Stress Engineer
TECCON Design & Engineering Spain - A Segula & Industriehansa Group Co.
March 2013 - November 2013 (8 months)
Customer:
Airbus
Main activities and responsibilities:
Stress activities for concessions produced during manufacturing support of the projects:
- A380 S19 and S19.1
Tools:
Analysis of both metallic and composite structures using finite element analysis (FEM with Nastran/Patran) and analytical "hand" calculations (Excel & visual Basic), Airbus legacy tools (Urco, Ancolab, Cofus, Ares, PPC…), SAP, and certifications documents are used.
Aeronautical MRB Engineer.
Aciturri Composites
July 2011 - March 2013 (over 1 year)
Customer:
Airbus, Airbus Military
Main activities and responsibilities:
Process of no-conformity documents and developing repair for Aeronautics structures in projects:
- Airbus A380 Rudder, Elevator, wings and HTP
- Falcon F7X elevator & HTP
- Airbus A320 HTP
Structural and functional analysis of the repair.
Development of repair manuals for Aeronautics composites.
Department Engineering / Maintenance
TREVES
November 2010 - April 2011 (5 months)
Responsible for monitoring and analysis maintenance indicators (% No TRG / TRS failures, MTTR,
MTBF, D, Costs ...).
Responsible for planning, management and improvement of preventive and predictive maintenance.
Implementation of predictive maintenance using vibration analysis.
Collaboration with the Department of Lean manufacturing.